 |
Profitability at different levels
of operation. |
 |
Spin plan for Optimum Production and
Quality Levels achievable. |
 |
Project cost for different capacity
operations with a break up on Land,
Building, Machinery, Accessories cost,
Working capital requirement and Production
cost. |
 |
Production cost for different raw
materials and different counts. |
 |
Ideal layout of machines and material
flow. |
 |
Facilities required such as Filter
room, Humidification, Compressor and
Power. |
 |
Accessories required such as Cans,
Bobbins, Ring tubes and Lap spools. |
 |
Location and Characteristics of the
yarn markets. |
 |
Global demand and domestic demand
for yarn. |
 |
Projected growth of global and domestic
yarn, fabric and garments. |